City of Kitchener
Waterloo Region
Hub: Impact Network
The City of Kitchener realized GHG reductions and cost savings by installing a coil on a supply air duct.
Industry
Public administration
Size
Large
Date Joined:
June 28, 2011
Action Areas
SDGs
Project Snapshot
Installed a coil on a supply air duct at City Hall to reclaim the heat exhausted through the evaporative fluid cooler that is created when the air handling unit is in dehumidification mode.
$4,000
Cost
2 years
Payback Period
tonnes of GHGs/year
17.26
GHG Reductions
/year
$2,000
Cost Savings